Desert Road Rehabilitation — Part Three
Desert Road, Jordan / Joint Venture Member
Expansion and improvement of approximately 12 km of main roads, with four lanes, traffic islands and shoulders. The 850 m Al-Shomar connection includes a 650 m precast concrete bridge over the Zarqa River. Works also covered secondary roads, retaining walls, culverts, drainage and utilities, road lighting and traffic safety provisions.
Expansion and improvement of approximately 12 km of main roads, with four lanes, traffic islands and shoulders. The 850 m Al-Shomar connection includes a 650 m precast concrete bridge over the Zarqa River. Works also covered secondary roads, retaining walls, culverts, drainage and utilities, road lighting and traffic safety provisions.