Rehabilitation and mentainance of the existing 3.2 KM runway (45m width and 7.5 sholders each side) including reinstatement of the surface asphalt layer with 7cm thickness and applying of 2 layers of SBS asphalt with 4cm and 6cm, all painting works, lighting works and earth works for stability of side slopes
King Hussein International Airport/ Aqaba Rehabilitation and maintenance.
Category: Done Projects
Number Of Tenders | 28/2010 |
Name Of Tenders | King Hussein International Airport/ Aqaba Rehabilitation and maintenance. |
Owner | Aqaba Development Company |
Engineer/ Supervisor | Associated Consulting Engineers |
Contract Value | 5,995,000.000 |
Final Value | 6,653,221.82 |
Starting Date | -0001-11-30 |
Period | 300 |